A combined waterproofing and ground gas design for a new mixed-use building on a contaminated site beside the New River.
Site investigation found contamination including dibenzo(a,h)anthracene, CO₂, TPH and asbestos, so the pathway between the ground and the building had to be managed.
The technician verifying the gas membranes was highly impressed with the specification and installation.
CommercialKensington, LondonKensington Forum HotelSpecialist waterproofing to the multi-level basement of a major London hotel redevelopment.Type A preparation, resin injection, screedingRead case study
ResidentialNorth LondonBasement and pool for a North London family homeA Grade 3 basement under BS 8102, with a swimming pool, external deck and plant room, for a detached period house.Type C, Type A polyurea, RenStrength™, dual pumpingRead case studyCommercialHeritageBromley, South East LondonThe Royal Bell, BromleyRenStrength™ Type A waterproofing to vaults and basement walls during the refurbishment of a listed Bromley landmark.RenStrength™ Type ARead case study